Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about off the Clacton-on-Sea coast in the Northern Thames Estuary. The 108MW Gunfleet Sands 1 wind farm gained planning consent in 2003/4; in 2006 Dong Energy acquired the project and submitted an application for a second 64MW windfarm Gunfleet Sands 2 adjacent to the first, which received consent in 2008. Construction of both wind farms using Siemens Wind Power SWT-3.6-107 took place between 2008 and 2010. In 2010 planning began on a demonstration project Gunfleet Sands 3, used to test Siemens' 6MW wind turbine model; two 6MW turbines were installed in 2013. ==Gunfleet Sands 1 & 2== Gunfleet Sands 1 & 2 are located 7 km south east of Clacton-on-Sea, Essex, UK; in water at depths of (spring tidal range ~4.6m); Gunfleet 1 consists of 30 turbines in a 5x6 array, whilst Gunfleet 2 consists of a 9x2 array of turbines directly adjacent to the southeast; the installed capacities are 108 and 64MW respectively. The average wind speed is at 60m elevation. The offshore turbines connect to a 33kV offshore substation, which steps up the tranmission voltage to 132kV; the export cable makes landfall at Holland Haven (nr. Holland-on-Sea), and underground cables connect it to the National Grid at the Cooks Green substation.〔About Gunfleet Sands (Dong) ''Offshore substation''〕〔Sources: * * *〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Gunfleet Sands Offshore Wind Farm」の詳細全文を読む スポンサード リンク
|